|
Détails sur le produit:
Contact
Causez Maintenant
|
| Temps d'installation: | 4 à 8 semaines selon la taille | Utilisation des produits: | Construction du bâtiment |
|---|---|---|---|
| Cadre: | Structure en acier | Impact environnemental: | Matériaux recyclables utilisés |
| Exigence de maintenance: | Faible entretien | Appliquer: | Facile à appliquer |
| Matériel: | Acier à haute résistance | Technique: | Chaud roulé |
| Durabilité: | Haut | Flexibilité du produit: | Flexible |
| Flexibilité: | Flexible | Protection de l'environnement: | Matériel respectueux de l'environnement |
| Fabrication: | Personnalisé | Installation: | Rapide |
| Mettre en évidence: | Recyclable Steel Structure Building,High-strength Steel Frame Building,Fast Construction Steel Warehouse |
||
Method 1: We provide detailed shop drawings prior to installation.
Method 2: Comprehensive installation training available at our factory, including assembly of sample structures when required.
All structural components, panels, bolts, and accessories are packed to withstand ocean transportation in 40'HQ containers. Our skilled workers use cranes and forklifts to ensure safe loading at our factory facility.
| Item | Description | Specification |
|---|---|---|
| 1 | Location (where will be built?) | _____country, area |
| 2 | Size: length*width*height | _____mm*_____mm*_____mm |
| 3 | Wind load (max. wind speed) | _____kn/m², _____km/h, _____m/s |
| 4 | Snow load (max. snow height) | _____kn/m², _____mm |
| 5 | Anti-earthquake | _____level |
| 6 | Brickwall needed or not | If yes, 1.2m high or 1.5m high |
| 7 | Thermal insulation | If yes, EPS, fiberglass wool, rockwool, PU sandwich panels; if not, metal steel sheets (lower cost) |
| 8 | Door quantity & size | _____units, _____(width)mm*_____(height)mm |
| 9 | Window quantity & size | _____units, _____(width)mm*_____(height)mm |
| 10 | Crane needed or not | If yes, _____units, max. lifting weight____tons; max. lifting height _____m |
Personne à contacter: Sun
Téléphone: +86 18866391899