![]() |
Brand Name: | YDX |
Model Number: | YDX-KF5 |
MOQ: | 10-10000 square meters |
Price: | $35.00-$63.00 |
Delivery Time: | 20-30 works days |
Payment Terms: | T/T |
Highlight: Metal Structural Storage Warehouse ,Pre-engineered Storage Warehouse
Processing Steps of Prefabricated Steel Structure Buildings:
Planning and Design
Prefabricated steel buildings starts with a detailed planning and design phase. During this stage, the project’s requirements are identified, and the building’s specifications are established. Factors such as size, layout, and intended usage are considered to ensure that the final design meets the client’s needs. The planning phase also includes obtaining necessary permits and approvals, as local regulations may impact the building’s design.
On-Site Assembly
After the prefabricated components are transported to the site, the assembly process begins. Since the parts are pre-engineered, they fit together seamlessly, making the installation process much faster than traditional construction methods. A skilled team of workers assembles the steel frame, attaches the wall panels, and installs the roofing system. Depending on the size and complexity of the building, the assembly process can take anywhere from a few days to a few weeks.
We own more than 20 engineers who have abundant experience for various types buildings. Before design, all requirements will be collected from clients. The design will obey the requirements and pass the calculation check by the architectural soft, such as CAD, PKPM, 3D3S etc.
For the initial planning, we will design the construction blueprint after confirming the client’s requirements details. With the check and feedback from the clients, we will make the revise if possible.
After the confirm, we will make further steel structure detailed drawing to prepare the production. This will still be offered to the clients to confirm. Double check will guarantee the building with correct details.
Container House Prefab | |
Item | Prefab Homes |
Steel Structure | Prefab steel structure |
Wall Panel | 0.326/0.376/0.426/0.476mm THC steel sheet |
50/75/100mm THC EPS / rock wool / glass wool / pu sandwich panel | |
Wall Color | White grey and more(Depending on quantity) |
Roof | 0.326/0.376/0.426/0.476mm THC steel sheet |
50mm THC EPS / rock wool / glass wool / pu sandwich panel | |
Door | 0.326/0.376/0.426/0.476mm THC steel sheet |
50mm THC EPS / rock wool / glass wool /pu sandwich panel with lock | |
Window | Aluminum PVC sliding door with security bar |
Floor | MGO / cement fiber floor board |
Electricity | Pre-wired with lighting and circuit distributor installed |
Steel Structure Building Installation steps:
1.Foundation construction (pre-embedded anchor bolts)
Installing detailed drawing will be offered in advance.
2. Column installation
One worker commands truck crane how to move, 3 ~ 4 workers cooperate with crane to install the steel column, put column to anchor bolt location.
3.Beam installation
After completing the installation of adjacent two steel column, then main beam begin to install.
4.Installing roof & wall purlin
The roof and wall purlin will be installed after finishing column and beam. Bolting the purlin on the main structure.
5.Fixing wall and roof sheet
To fix the wall sheet on wall purlin by self-tapping screw; then fix the roof sheet.
6.Fixing the cover
To install the cover on the corner, eave, window and door opening.
7.Install windows and doors.