Product Details:
Contact Now
Chat Now
|
Dimensions: | Customers' Requirement | Building Type: | Frame |
---|---|---|---|
Structure Type: | Frame | Purlin: | C Or Z Section Galvanized Steel |
Use: | Warehouse, Workshop | Construction: | Steel Frame |
Frame Type: | Steel Frame | Earthquake Resistance: | Strong |
Windows: | Aluminum | Seismic Design: | High Seismic Zone |
Installation Time: | Short | Aesthetics: | Modern |
Construction Type: | Frame | Cost: | Moderate |
Product Resistance: | Corrosion Resistant | Finish: | Galvanized/Painted/Cladding |
Roof: | Glass Wool, EPS, PU | Product Fire Resistance: | Fireproof |
Door: | Sliding Door Or Rolling Door | ||
Highlight: | prefabricated steel warehouse large span,steel frame building construction durable,large span steel structure warehouse |
Attribute | Value |
---|---|
Dimensions | Customers' Requirement |
Building Type | Frame |
Structure Type | Prefabricated |
Purlin | C Or Z Section Galvanized Steel |
Use | Warehouse, Workshop |
Construction | Steel Frame |
Our prefabricated steel structure warehouses combine energy efficiency with durable construction. Engineered for optimal performance, these buildings offer significant advantages in cost, maintenance, and environmental impact.
All the structure components, panels,bolts and sort of accessories will bewell packed with standard package suitable ocean transportation and loaded into 40’HQ.
All the products are loaded at the loading site of our factory using crane and forklift by our skilled workers,who will prevent the goods to be damaged.
1 | Location (where will be built?) | _____country, area |
2 | Size: length*width*height | _____mm*_____mm*_____mm |
3 | wind load (max. wind speed) | _____kn/m2, _____km/h, _____m/s |
4 | snow load (max. snow height) | _____kn/m2, _____mm |
5 | anti-earthquake | _____level |
6 | brickwall needed or not | If yes, 1.2m high or 1.5m high |
7 | thermal insulation | If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; . if not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former |
8 | door quantity & size | _____units, _____(width)mm*_____(height)mm |
9 | window quanity & size | _____units, _____(width)mm*_____(height)mm |
10 | crane needed or not | If yes, _____units, max. lifting weight____tons; max. lifting height _____m |
Contact Person: Sun
Tel: 18866391899